The 6.8km Clem7 Tunnel is one of the largest infrastructure projects ever to be undertaken in Qld. It boasts more than 250 cameras, optical fibre equal to 23 times the...
Due to the risk of possible accidents in the tunnel, all cable specifications in the initial tender called for Low Smoke Zero Halogen Sheath or 2 Hour Fire Rated cable....
The Diamantina Power Station Project (DPS) was a $570 million investment in Mount Isa by...
The Hamer Hall Redevelopment required a reliable and state of the art structured cabling solution...